Pre-Feasibility Study: Support for Establishing of Circular Economy through Integrated Solid Waste Management in the Coastal Region of Bangladesh
Country : Bangladesh
Name of the Assignment: Pre-Feasibility Study: Support for Establishing of Circular Economy through Integrated Solid Waste Management in the Coastal Region of Bangladesh
Funded by: Korea Ministry of Environment (KMOE)
Name of Client: Chattrogram City Corporation &KEITI, KECC and HamSolz
Location: Chattrogram, Bangladesh
Start Date (Month/Year) :2022-Completion Date(Month/Year): 2023
Objectives of the Project:
- Documents review and Data Collection from the field.
- Site Visit (CCC area and surroundings) for observing the activities, facilities and all other details about SWM.
- Conduct the necessary FGDs, KII and IDIs.
- Industrial site visit to observe the SWM situation
- 02 Landfill visit and assessment(Waste disposal pattern, waste generation quantity, transport, facilities,
- manpower, environmental impact, etc)
- Waste composition/characterization survey and analysis (Separate waste analysis for 02 blocks of CCC based on 02 landfill sites. It will be conducted in 03 income level areas)
- Chemical test of wastewater/leachate (will be tested in the lab)
- Assessment of City's waste management system
- Site Visit/gather information of 09 surroundings municipalities of CCC about SWM activities, facilities, interlink of transportation/distance, etc.
Detail Description of Actual Services will be provided by CC’s Experts and Staff:
The main activities in the project included;
City Visit, observation and reconnaissance
- Primary waste collection by CCC
- Primary collection at HH level by PCSP (private collection service providers)
- Operation and activities at STS (secondary transfer station) and capacity of STS to store and carry out the waste transfer operation
- City markets (grocery and vegetable)
- Any informal/poorly managed secondary waste management facility
- Recycling initiatives, waste pickers activities, waste traders, circular economy, etc.
- Finial disposal/Landfill sites
Waste generation, collection and disposal survey
- waste generation at the HH level
- Waste storage practice
- Waste collection system and disposal
- Amount of waste per non-motorize tri-cycle van
- Waste composition survey, laboratory test and analysis
- City waste was taken at the landfill sites from the tri-cycle vans, filled with collected waste. Then it was segregated and analyze. It has also collected waste water/leachate from landfill site, preserve it properly and gave it to the lab for chemical test and